Data Network Drawing

Data layout, cable pathways, rack elevations, legend and point schedule — export as A3 PDF.

MUNICIPALITY OFFICE - GF UNITS 10 & 11
AL AIN, ABU DHABI, UAE · CLIENT: MUNICIPALITY AFFAIRS
DATA LAYOUT, CABLE PATHWAYS & RACK ELEVATIONS
DWG: ELV-DAT-07-A / ELV-RCK-08-A · NTS / SCHEMATIC · REV A - FOR REVIEW
1. Data Layout & Cable Pathways
Men Unit 10Block 02M-RACK-1Women Unit 11Block 01W-RACK-1CABLE TRAY SPINE — 300 x 50 mm PERFORATEDSCHEMATIC / NTS
2. Rack Elevations — 32U Front Views
M-RACK-1
32U · 17U used · 15U spare
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Fibre LIU / ODF1U
Data Cable Manager1U
PP-A Patch Panel 24P1U
PP-B Patch Panel 24P1U
SW-1 Access Switch 48P1U
Data Cable Manager1U
PP-C Patch Panel 24P1U
PP-D Patch Panel 24P1U
Router / Firewall1U
Voice Gateway1U
Blank Panel2U
Fixed Shelf2U
UPS 3 kVA3U
Spare 15U
W-RACK-1
32U · 16U used · 16U spare
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Fibre LIU / ODF1U
Data Cable Manager1U
PP-A Patch Panel 24P1U
PP-B Patch Panel 24P1U
SW-1 Access Switch 48P1U
Data Cable Manager1U
PP-C Patch Panel 24P1U
Router / Firewall1U
Voice Gateway1U
Blank Panel2U
Fixed Shelf2U
UPS 3 kVA3U
Spare 16U
3. Legend & General Notes
Legend
Data point[E-ELV-DATA-OUTLET]
Telephone point[E-ELV-TEL-OUTLET]
Wireless access point[E-ELV-WAP]
Cable tray / pathway[E-ELV-TRAY]
Rack / cabinet location[E-ELV-RACK]
General Notes
  1. 1.All drops Cat6A F/UTP LSZH, T568B, max 90 m permanent link.
  2. 2.Backbone fibre OM4 multimode, LC connectors, terminated in LIU / ODF.
  3. 3.Cable trays 300 x 50 mm perforated, hot-dip galvanised and bonded to earth.
  4. 4.Minimum 300 mm separation between power and data pathways; crossings at 90 degrees.
  5. 5.All racks 32U, 800 x 600 mm, floor mounted and earthed to the building earth bar.
  6. 6.UPS 3 kVA per rack, minimum 30 minutes autonomy for network equipment.
  7. 7.Test and certify every permanent link and issue test reports on handover.
Note: All quantities are schematic and subject to site verification before ordering.
4. Point Schedule & Summary
Zone / LocationData (Red)Tel (Black)WAPTotal Drops
Men Unit 10
Block 02 · M-RACK-1
246333
Women Unit 11
Block 01 · W-RACK-1
184224
TOTAL SYSTEM DROPS4210557
Total Drops
57
Data Points
42
Telephone Points
10
Access Points
5
Project
MUNICIPALITY OFFICE - GF UNITS 10 & 11
Location
AL AIN, ABU DHABI, UAE
Client
MUNICIPALITY AFFAIRS
Drawing Title
DATA LAYOUT, CABLE PATHWAYS & RACK ELEVATIONS
Drawing No.
ELV-DAT-07-A / ELV-RCK-08-A
Scale
NTS / SCHEMATIC
Sheet
A3 - COMBINED (1 & 2)
Date
12/10/2026
Base DWG
DATA LAYOUT DWG 07
Revision
REV A - FOR REVIEW
Drawn / Checked
ENG. MORAD AL KAYED
Status
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL · Issued by Seven Trends FZE · 12/10/2026