Back

CCTV Planning Studio

Upload a floor plan, place cameras & racks, and auto-calculate power, storage, rack & cabling.

Project
Project Name
Project No.
Date
Site Address
Customer
Customer Name
Contact Person
Phone
Email
Contractor
Contractor Name
Contact Person
Phone
Email
Scale: 100 px =cm
Upload a floor plan
Image, SVG, PDF, or DXF — multi-page PDFs are split automatically.
ID Identification (min 25 fps)REC Recognition (min 12 fps)DET Detection (min 12 fps)VV Vehicle View (min 25 fps)R RackCable to rackMCC V2.0 colors
Rack Estimate
3U
Recommended: 9U cabinet · 0 rack(s) on 0 page(s)
NVR1 × 2U = 2U
Switch (8-port)1 × 1U = 1U
Cabling Estimate
Place an equipment rack on each floor plan page to estimate cable runs (each camera routes to its nearest rack).
Summary
Cameras
0
Total Power
35 W
Rack Size
3U
Storage
0 GB
Min Storage
—
Cable
0 m
MCC Entity Type
Coverage Level Distribution
0 cams
Identification
25 fps min
0 cams
Recognition
12 fps min
0 cams
Detection
12 fps min
0 cams
Vehicle View
25 fps min
Unassigned
3U · 35 W
DeviceBrandModel No.RackPower (W)CountTotal (W)
30
5
Rack total: 35 W
Grand Total (all racks)35 W
Place cameras on the floor plan to auto-calculate storage.
Grand Total (all racks)
HDD size:TB
Bw 0.0 Mbit/s · Disk 0 GB · HDDs 0 × 4TB
Camera Inventory0 camera(s)
Bulk edit
#LabelPageTypeFormBrandModelRangeAngleCable (m)
No cameras placed yet. Use "Add Camera" on the floor plan.
Rack Component Diagram0 rack(s)
Unassigned9U · 3U used
987654321NVRSwitch (8-port)
NVR— · 2U
Switch (8-port)— · 1U
Complete Report OnlineFills the approval block & notes in the downloaded file
Engineering Remarks / Notes
Approved By
Approval Date
Customer Name
Customer Date
Approval & Sign-off
Eng. Morad Al Kayed
Seven Trends FZE · Approving Engineer
Customer
Name / Date / Stamp
Approved by Eng. Morad Al Kayed from Seven Trends FZE.